The National Grid Corporation of the Philippines (NGCP) has energized its P67.98 billion, 230-kilovolt (kV) Cebu-Negros-Panay (CNP) backbone project, aiming to double the power capacity of Negros and Panay islands. President Ferdinand Marcos Jr. led the ceremonial energization and inauguration of the project.
This is AI generated summarization, which may have errors. For context, always refer to the full article.
With the 230-kV CNP line and transmission facilities, NGCP said, Negros-Panay’s power supply will be boosted more than double from the current 180 megawatts. He said it would benefit some 16 million people in Central and Western Visayas and showcase the government’s commitment to national empowerment and economic growth.
Bacolod Mayor Alfredo Abelardo Benitez expressed hope for reduced blackouts with the the multi-billion-peso transmission infrastructure energized, while Central Negros Electric Cooperative General Manager Arnel Lapore welcomed CNP’s potential to enhance power reliability in the region.
NGCP Philippines Backbone Project Power Capacity Negros Panay Ferdinand Marcos Jr.
Philippines Latest News, Philippines Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Marcos inaugurates NGCP's P67.98B Cebu-Negros-Panay backbone projectMANILA, Philippines: President Ferdinand Marcos Jr. on Monday inaugurated the 230 kV Cebu-Negros-Panay (CNP) Backbone project that is seen to enhance the resilience and reliability of power infrastructure in Visayas.
Read more »
Los Cimborios de Panay: A reminder of Panay’s thriving sugar trail'Simboryos, or smokestacks, are now symbols of a bygone era. They remind me of a time when sugar cane was gold.'
Read more »
[ANALYSIS] Panay blackoutsThese blame games reflect gross ignorance of the nature of reserves at the policy level where the supply inadequacies and reserve imbalances of the Visayas Grid are due to the lack of resource adequacy assessments
Read more »
3ID joins Panay, Romblon, Guimaras ‘Victory Day’ commemorationSunStar Publishing Inc.
Read more »
Panay faces power issues with coal plant maintenance til March 30Defining the News
Read more »
‘BIG HELP TOWARDS STABILITY’ | Marcos arriving on April 8 for NGCP power project, DAR programSunStar Publishing Inc.
Read more »