'Build, Build, Build' had several updates since 2016, starting with a list of 75 projects in 2017. It has since evolved and, on its last year, only over a dozen projects in the 119-item list have been completed. Check out the status of these projects:
the Department of Transportation to “transfer” some of the flights from the Ninoy Aquino International Airport to Sangley Airport in Cavite, in a bid to decongest the main gateway. The President gave the DOTr a November 2019 deadline.
This project was not part of the original Build, Build, Build list and was added in 2021 when it was tagged as completed. Funding source: Asian Development Bank ODA It was supposed to be powered by 2019, but tech giants Google and Meta failed to get the approval of the United States government to land in Hong Kong over national security issues. The US Federal Communications Commission granted the landing license in January 2022 under a new petition that removed the Hong Kong segment.Funding source: Private-public partnership
Philippines Latest News, Philippines Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
NorthWind cleared to build power transmission facility - BusinessWorld OnlineNorthWind Power Development Corp. has secured regulatory approval to build a point-to-point energy transmission facility that will connect its 51.9-megawatt (MW) Bangui Bay wind farm to the Luzon grid. READ:
Read more »
IN PHOTOS: Celebrities we would like to see in a beauty pageantThese famous women celebrities have the looks, the build, and the brains of a beauty queen.
Read more »
Mayor-elect Baste’s admin off to a challenging startDAVAO CITY (MindaNews / 28 June) – Incoming Vice President Sara Duterte said the administration of Mayor-elect Sebastian “Baste” Duterte is off to a challenging start with prices of basic commoditi…
Read more »
NorthWind cleared to build power transmission facility - BusinessWorld OnlineNorthWind Power Development Corp. has secured regulatory approval to build a point-to-point energy transmission facility that will connect its 51.9-megawatt (MW) Bangui Bay wind farm to the Luzon grid. READ:
Read more »
Newly built bridge seen to boost drive to end insurgency in N. SamarThe newly-built Simora Bridge in Laoang, Northern Samar, one of the three bridges under the Samar Pacific Coastal Road Project, is seen to boost the anti-insurgency campaign of the government.
Read more »