Covered link between Penang International Airport terminal, carpark needed

Philippines News News

Covered link between Penang International Airport terminal, carpark needed
Philippines Latest News,Philippines Headlines
  • 📰 staronline
  • ⏱ Reading Time:
  • 47 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 22%
  • Publisher: 75%

The new PIA multistorey carpark in Bayan Lepas has 1,742 bays.

As there is no covered walkway between the carpark building and airport terminal, those who park in the building need to cross the road under the blazing sun or in the rain to reach the terminal.

“It will also look more complete with a covered walkway as presently, there is a ‘disconnect’ between the airport terminal and carpark.“We need to bear in mind this airport is the third busiest in Malaysia,” said Sazali.Bayan Baru MP Sim Tze Tzin said a pedestrian link bridge costing RM5mil would be built between Level 3 of the RM70mil carpark and kerbside of the main terminal building near the departure hall.

System operator CJ Technology Sdn Bhd managing director Ling Choon Jooi, who was overseeing operations at the control room, said the latest system with such features could only be found at this parking facility. “The car’s image and the number plate are captured once it enters the parking lot that is equipped with sensors and cameras.

Malaysia Airports Holdings Bhd managing director Datuk Iskandar Mizal Mahmood said the new multistorey carpark was meant to alleviate parking problems at PIA.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

staronline /  🏆 4. in MY

Philippines Latest News, Philippines Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Cloud seeding in Penang to begin at end of month, says PBAPPCloud seeding in Penang to begin at end of month, says PBAPPGEORGE TOWN: Cloud seeding operations to induce rain and replenish two dams on the island will begin at the end of April, says the Penang Water Supply Corporation (PBAPP).
Read more »

Penang to start cloud seeding from April 29 to refill island dams as demand growsPenang to start cloud seeding from April 29 to refill island dams as demand growsGEORGE TOWN, April 25 — Cloud seeding operations over water catchment areas on Penang island are expected to start from April 29, the Penang Water Supply Corporation (PBAPP)...
Read more »

‘Green wave’ will thwart multiracial Penang govt, says analyst‘Green wave’ will thwart multiracial Penang govt, says analystOh Ei Sun says Pakatan Harapan should count itself lucky if it retains power in Penang.
Read more »

May 5 fixed for case management of appeals by ex-Penang repsMay 5 fixed for case management of appeals by ex-Penang repsThis is their bid to challenge state anti-hoping law.
Read more »

Former beauty queens paddleboard their way to a new adventure in PenangFormer beauty queens paddleboard their way to a new adventure in PenangWhat happens when two ex-beauty queens, a love for the sea and an ambitious business idea come together? Welcome to paddleboarding.
Read more »

May 5 case management of appeals by ex-assemblymen challenging Penang Anti-Hopping lawMay 5 case management of appeals by ex-assemblymen challenging Penang Anti-Hopping lawZulkifli, along with Dr Afif Bahardin, Khaliq Mehtab Ishaq and Zolkifly Md Lazim have filed appeals against the Penang High Court’s dismissal of their suits early this year. theSun theSundaily court lawsuit politics Malaysia
Read more »



Render Time: 2025-04-06 11:36:21